- Location & Date: Philippines 2013-2019.
- Description: The project consists of 50 km 4-lane Toll Roads.
- Project Components: Design Review and Validate the configuration of the existing; Detailed Engineering Design; Topographic Survey; Hydrological Study; Construction Supervision.
- Client: Private Infra Dev Corporation (PIDC).
Share this post