
- Location & Date: Cambodia On Going
- Description: The Ring Road was divided into 3 major phases, in such a way that it will connect all the five main gates of/into Addis from all other regions, for a total length of 52 km. Phase III encloses also 17 km of frontage and cross roads, and no.10 junctions at separate grade (3 roundabout and 7 diamond shape).
- Project Components: Feasibility Study; Detailed Survey; Detailed Engineering Design; Roads Selection; Supervision and monitoring the Construction; Long Term Preventive Maintenance; Monitoring of Environmental Compliance; Training of personnel.
- Client: Ministry of Rural Development (MRD) Kingdom of Cambodia