Location & Date: Italy - Marche Region 2009-2011. Description: Santa Lucia Mall in Urbino. Project Components: Slope Protection Final Design. Client: Municipality of Urbino. Share this post Share on FacebookShare on Facebook TweetShare on Twitter Pin itShare on Pinterest Share on LinkedInShare on LinkedIn Post navigationPreviousPrevious post:ETILENO XXI, MEXICONextNext post:LANDSLIDE CONSOLIDATION WORKS, ITALYRelated postsCONSULTANCY DESCRIPTION FOR DESIGN AND CONSTRUCTION SUPERVISION OF ARGOUT – SARFAIT ASPHALT ROAD , OMANJune 5, 2023ZE MANAM DESCENT, SAUDI ARABIAApril 10, 2023GHILWA DESCENT, SAUDI ARABIAApril 10, 2023HIZNAH DESCENT, SAUDI ARABIAApril 10, 2023NAJRAN JIZAN ROAD, SAUDI ARABIAApril 10, 2023MAHLAH – GUBBRAT AL TAM – ISMAIYAH ROAD IN , OMANApril 10, 2023CONSULTANCY SERVICES FOR DESIGN AND CONSTRUCTION SUPERVISION OF HASIK – ASH SHUWAYMIAH ASPHALT ROAD, OMANApril 10, 2023DUALIZATION OF BIDBID – SUR ROAD, SECTION 1, PACKAGE 1A – DESIGN OF CUT AND COVER TUNNELS AT CH 27+400 AND 30+500, OMANApril 10, 2023DESIGN AND CONSTRUCTION OF ASPHALT ROAD BETWEEN AL WAJAJA (WILAYAT SHINAS) AND AL FAI (WILAYAT MAHDA), OMANApril 10, 2023GEOTECHNICAL ENGINEERING DESCRIPTION RELATED TO EARTH FILL AND SLOPE STABILITY AT AAMAH VILLA, BOUSHER, OMANApril 10, 2023
CONSULTANCY DESCRIPTION FOR DESIGN AND CONSTRUCTION SUPERVISION OF ARGOUT – SARFAIT ASPHALT ROAD , OMANJune 5, 2023
CONSULTANCY SERVICES FOR DESIGN AND CONSTRUCTION SUPERVISION OF HASIK – ASH SHUWAYMIAH ASPHALT ROAD, OMANApril 10, 2023
DUALIZATION OF BIDBID – SUR ROAD, SECTION 1, PACKAGE 1A – DESIGN OF CUT AND COVER TUNNELS AT CH 27+400 AND 30+500, OMANApril 10, 2023
DESIGN AND CONSTRUCTION OF ASPHALT ROAD BETWEEN AL WAJAJA (WILAYAT SHINAS) AND AL FAI (WILAYAT MAHDA), OMANApril 10, 2023
GEOTECHNICAL ENGINEERING DESCRIPTION RELATED TO EARTH FILL AND SLOPE STABILITY AT AAMAH VILLA, BOUSHER, OMANApril 10, 2023