- Location and Date: HS/HC Verona-Padua railway line, Verona-Vicenza sub-section, 2018
- Description: Road Bridge NV56 Steel Arch 60m.
- Project Components: Final design of the deck has a span of 60 m is composed of 2 metal truss arches connected to each other through bracings (positioned on the upper arch), diaphragms (placed on the lower beam every 2.5m) and by the casting of on-site completion of the reinforced concrete slab. The r.c. slab has a thickness ranging from 25cm to 40cm, and is planned to be cast on 5cm-thick prestressed slabs.
- Client: IRICAV 2