
- Location & Date: Saudi Arabia 2022-2023.
- Description: Excavation of Western and Eastern portal for the tunnel of “The Line" in Neom.
- Project Components: Geomapping. Slope support measures.
- Project Owner: Neom
- PMC: Bechtel
- Main Designer: AECOM
- Contractor: Sajco



