- Location & Date: Saudi Arabia, ongoing.
- Description: 190 km of road in the south of Saudi Arabia (Najiran-Assir area), including 15 interchanges, 94 bridges totaling to 11 km and 7 bored tunnels with the total lenght of 6.5 km.
- Project Components: Topographic survey, geological, geotechnical studies, from concept to final road design and from concept to final structural design of bridges, including the the geotechnical design of foundations.
- Client: Ministry of Transportation and Logistics.
Share this post