
- Location & Date: Oman, 2017 – On going.
- Project Components: Preliminary study identified 14 No potential sites for new airport subsequently reduced to one site at Huet after taking into account Accessibility, Construction problems, Air Navigation, Environmental issues etc. Detailed study and Concept Design with cost estimate for Huet Airport (Code 4E) with its 3,000 m x 45 m asphalt runway with 7.5 m shoulders, 23 m wide taxiways as well as 620 m x 100 m concrete apron and all associated buildings. In addition Diba & Madha Airstrips each with 600 m runway and buildings.
- Client: Civil Aviation Authority Airport Projects.
