- Location & Date: Oman, 2017 – On going.
- Project Components: The Phase 1 study confirmed that the existing airstrips at Diba and Madha were suitable for reuse after upgrading. The Phase 2 study included a concept design for Diba’s 600 x 18 m wide asphalt runway, Madha’s 725 x 23 m wide existing asphalt runway with Lima’s 600 x 30 m wide asphalt runway added.
Share this post