
- Location & Date: Oman 2015 – 2016.
- Description: Consultancy Services for Feasibility Study and Detailed Design.
- Project Components: Study the erosion and instability issues occurred along the slope of high embankments, at the locations of the drainage outlet structures and to provide stabilization remedial measures. The scope of work is to provide stabilization remedial measures at eight (8) culverts locations. The following mitigation measures were designed and proposed: Rip Rap slope protection, Anchored gabion mattresses, Removal of loose soil from the rock slope and Diversion of Culvert inlet or outlet.
- Client: STFA , Oman.

