
- Location & Date: Saudi Arabia 2020.
- Description: Doubling of King Fahd road (Majmah - Al Ghat) 17 km with 1 IC and 3 bridges totaling to 160 m.
- Project Components: Topographic survey, geological and geotechnical studies; concept to final road design; concept to final structural design of bridges, including the geotechnical design of foundations.
- Client: Ministry of Transportation and Logistics.



