- Location & Date: Saudi Arabia, 2021.
- Description: Improvement of two lanes mountain road located in Hizna descent (28 Km).
- Project Components: Conduct the status quo of the descents, make the final design of the realignment (tunnels) and study the slope stability
- Client: Ministry of Transportation and Logistics.
Share this post