
- Location & Date Oman 2005 – 2008
- Description Topographic and quantity survey, feasibility study. Study of existing drainage including hydrology studies, full design, cost estimate and construction supervision of works.
- Project Components The individual and isolated drainage systems commonly generates change of flow pattern and scheme. As a result some areas have potential of being flooded and/or experienced water stagnation. Followed integrated hydrological approach by studying the entire area and all contributing catchments including wadis, crossings.
- Client Muscat Municipality