- Location & Date: Oman 2012 – 2018.
- Description: Consultancy Services for Design & Construction.
- Project Components: Re-align and improve the existing road from Yiti to Sifa villages for a total length of 21.5 km. The road is designed with adequate drainage (for all weather conditions, slope protections, walls and special box culverts. Slope stability studies and geotechnical investigations.
- Client: Muscat Municipality.
Share this post