- Location & Date Oman 2017 – On Going;
- Project Components To study the remedial measures to cater the drainage problems in project area providing an urban drainage planning and management according to the results of the Hydraulic Analysis and Modelling.
- Project Components Main objective of this project was to perform a hydrological analysis and storm water protection of al Wajaja Border Post under development and to provide specific recommendation in term of relevant protection measures.
- Client Muscat Municipality
Share this post