
- Location & Date Oman 2015 – On going
- Project Components Hydrological assessment, Topographic survey, Analysing the flow conditions at the various sites and propose an appropriate storm water drainage system for the most critical parts of the Al Ilam area drainage system to be designed and constructed. Design criteria for this drainage system are already fixed, and the provisions for drainage shall cater with estimated 1/50 years flood.
- Client Muscat Municipality