
- Location & Date Oman: 2005 – 2014.
- Description: Consultancy Services for Design & Construction.
- Project Components: The 2-lane road is about 87 km long out of which about 7 km near Hasik Town and about 20 km near Ash Shuwaymiyah Town lie in flat terrain, where existing asphalt or track roads provide access in these area. The road traverses mountainous terrain cut and fill operations in soil and rock requires slope stability analyses in order to verify long term stability.
- Client: Ministry of Transport, Communications & Information Technology.

