- Location & Date: Oman 2016 – 2019.
- Description: Design & Build Contract for Booster Pump Station with Water Transmission System from Sipa to MISCO at SIE.
- Project Components: Hydraulic modelling and design of pipeline and booster station, Surge Analysis, Assistance during the construction.
- Client: International Expert Trad. & Cont.L.L.C.,Oman.
Share this post