- Location & Date: Cote D’Ivorie On Going.
- Description: The project consists of New motorway construction. Total length: 12.95 km.
- Project Components: Revision of the engineering drawings; Carry out of soils and materials investigations; Inspection, sampling, testing and analysis to comply with the technical specifications; Monitoring of Design, Improvement Works and Management and Maintenance Services.
- Client: Ministere De L’equipement Et De L’entretien Routier.
Share this post