- Location & Date Oman 2013 – 2016
- Description Design and construction Interchange, Dualization / Dual Carriageway extension of Link Road.
- Project Components Design Review and Construction Supervision of 03 Interchange Bridges each of length 100m across existing Muscat Expressway under live traffic.
- Client Muscat Municipality
Share this post